New Buck Corporation 80ZC manual

Models: 80ZC

1 18
Download 18 pages 13.71 Kb
Page 14
Image 14
Manual background

INSTALLING FIRESTOP RADIATION SHIELD: Nail the firestop Radia- tion Shield to' the bottom of the framed ceiling opening using at least two 8-penny nails per side.

CHIMNEY INSTALLATION INFORMATION

ROOF CLEARANCE

 

 

 

 

 

 

 

 

 

ROOF

 

 

 

 

 

 

 

 

 

Frame a square opening in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rr=

roof maintaining the required 2"

/'

 

 

clearance

to combustible materials

 

 

 

 

 

 

 

 

 

 

 

between the chimney and the framed

 

 

 

 

 

 

 

 

 

 

 

opening and roofing material.

 

 

 

 

 

 

 

 

 

 

 

INSULATION RADIATION

 

 

 

 

 

 

 

 

 

ATTIC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FIRES TOP

RADIATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHIELD

 

 

 

 

 

 

 

 

 

 

 

 

 

Provides

proper clearance.

 

 

 

 

 

 

 

 

 

 

 

2" clearance does not app~y.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CEILING

 

 

 

 

 

 

 

 

 

 

 

Clearance

between chimney

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and enclosing wall 2".

 

 

 

 

 

 

 

 

 

ROOM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8" Chimney fits between standard 16" OC joists .

12

Page 14
Image 14
New Buck Corporation 80ZC manual