New Buck Corporation GAS STOVE HEATER Continued, Connecting To Gas Supply, Accessories, page

Models: GAS STOVE HEATER

1 38
Download 38 pages 59.36 Kb
Page 18
Image 18
CONNECTING TO GAS SUPPLY

INSTALLATION

Continued

CONNECTING TO GAS SUPPLY

BACK STOVE PANEL

BACK VIEW

Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from heater (See Figure 18, BVFB series).

IMPORTANT: Install equipment shutoff valve in an accessible location. The equipment shutoff valve is for turning on or shutting off the gas to the appliance.

Installation Items Needed

Before installing heater, make sure you have the items listed below:

piping (check local codes)

sealant (resistant to LP gas)

equipment shutoff valve

tests gauge connection

sediment trap

tee joint

pipe wrench

SIDE VIEW

 

 

 

 

 

 

 

 

 

 

 

 

 

GAS

 

 

 

 

 

 

 

 

 

 

 

 

 

INLET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT

 

 

 

 

 

 

 

 

 

 

 

 

CONNEC-

 

 

 

 

 

 

 

 

 

TION

OF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACCESS

STOVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Apply pipe joint sealant lightly to male threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.

A CSA/AGA design-certified equip-

ment shutoff valve with 1/8" NPT tap is

an acceptable alternative to test gauge

connection. Purchase the optional CSA/

FIGURE 17 - GAS REGULATOR LOCATION AND GAS LINE ACCESS INTO STOVE CABINET

AGA design-certified equipment

shutoff valve from your dealer. See

Accessories, page 23.

The gas inlet connection for the stove heater is located on the lower right- hand side when viewed from the front of the unit. The gas connection can be made either through the bottom right side or through the lower back opening as illustrated in Figure 17. Make sure gas log heater is secured to the stove cavity assembly.

Approved Flexible Gas Hose (if allowed by local codes)

Gas Control

CSA/AGA Design-

From Gas Meter

Certified Equipment

(5” W.C.**to 10.5”

Shutoff Valve With

W.C. Pressure)

1/8” NPT Tap

 

Tee JointInstallation Items Needed

Pipe Nipple

Cap

3” Minimum

Sediment

Trap

FIGURE 18 - GAS CONNECTION

14

Page 18
Image 18
New Buck Corporation GAS STOVE HEATER Continued, Connecting To Gas Supply, Installation Items Needed, Accessories, page