![MACHINE PREPARATION](/images/new-backgrounds/52307/5230711x1.webp)
MACHINE PREPARATION
C1199 | FIGURE 1 |
MACHINE PREPARATION
Your
GAS/LP POWERED MACHINES
1.Uncrate the machine and carefully remove it from the skid to prevent damage.
2.Inspect the machine for obvious damage and check the controls for proper operation.
3.Connect and tighten battery cables.
4.Fill fuel tank with regular grade unleaded gasoline. *Install filled LP tank and connect fuel line to the tank. *Turn on service valve, check all LP connections for leaks. *Turn off service valve after inspection has been completed.
5.Check engine crankcase oil level. Although properly lubricated at the factory, check before starting engine. The engine uses no special break in oil. The recommended number of hours before the initial oil change is 5 hours (see maintenance chart).
6.For safety, do not operate until you have read the safety precautions and operation instructions in the manual.
*=LP Powered machines only
WARNING
To prevent possible fire, never fill fuel tank while the engine is running. Always be sure gasoline container and sweeper are electrically grounded before dispensing gasoline. This can be done by permanently attaching an insulated wire with a battery clip on the end to the gasoline container.
WARNING
Keep cigarettes, sparks, and open flame away from LP equipment.
Use extreme caution when inspecting for gas leaks.
1 - 5 | |
91 WS |
|