Nordyne M3RL installation instructions Verify proper operation after servicing

Models: M3RL

1 36
Download 36 pages 56.96 Kb
Page 25
Image 25
Verify proper operation after servicing.

tral line is connected to the white wire and the incoming "hot" line is connected to the black wire in the furnace junction box. The furnace will not operate unless polarity and ground are properly connected. See Figure 26.

!CAUTION:

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

Verify proper operation after servicing.

!ATTENTION:

Lors des opérations d'entretien des commandes, étiqueter tous les files avant des les déconnecter. Toute erreur de câblage peut être une source de danger et de panne.

S'assurer du bon fonctionnement de l'appareil après tout entretien.

Low Voltage Wiring

Install the thermostat per the manufacturer's instructions. The low voltage (24 volt) connec- tions from the thermostat are made at the terminal strip on the control board in the furnace. See Figure 28 for the proper connections for heating only (two-wire) and heating/cooling (four-wire) applications. The recommended minimum wire gauge for thermostat wiring is shown in Table 10.

 

 

 

 

 

 

3 Amp Fuse

Blower Off

60 90

120

180

 

 

 

 

COM

 

 

 

 

 

R

 

 

 

 

 

Timing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

24 V

 

 

 

 

 

TWIN

 

 

 

 

 

 

 

 

 

 

Y

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flame Signal

 

 

 

G

 

 

 

 

 

 

Light (Yellow)

 

 

 

W

 

 

 

 

 

 

 

Status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

6

3

 

 

 

Light (Red)

 

 

 

 

 

 

 

 

 

 

 

 

8

5

2

 

 

 

 

 

 

 

 

 

7

4

 

1

 

 

 

 

 

 

 

 

Common

 

 

 

 

 

 

 

 

 

 

 

 

Leads

EAC

 

Neutrals

 

 

 

 

 

 

 

 

 

 

 

Unused Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connect

HUM

 

 

 

 

Leads

 

 

 

 

 

 

 

 

 

HUM

M3 M2 M1

HEAT

COOL

EAC

XFMR

L1

Neutral

 

6

3

Lead of

 

 

5

2

 

 

 

 

 

 

 

 

Electronic

 

 

4

1

 

 

 

 

 

 

 

 

Air Cleaner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and/or Humidifier

 

 

 

 

 

 

 

 

 

 

 

 

Here.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electronic Air Tap

 

Humidifier Tap

 

 

 

 

 

(.5A@ 120 VAC)

 

 

 

 

 

 

 

 

 

 

(.5A@ 120 VAC)

 

 

These motor speed taps are

 

 

 

 

 

 

 

 

 

 

 

 

 

 

not used for two-stage models

Figure 27. Blower Speed Tap Location

Furnace

Cabinet

Nominal

Maximum

Minimum

Maximum

Minimum

Maximum

Input

Width

Electrical

Operating

Operating

Furnace

Wire

Fuse or Circuit

(Btuh)

(in.)

Supply

Voltage

Voltage

Amperes

Gauge

Breaker Amps*

60,000

19.75

 

115-60-1

127

103

 

9.7

14

15

80,000

19.75

 

115-60-1

127

103

 

9.7

14

15

 

 

 

 

 

 

 

 

 

Thermostat Wire Gauge

 

Recommended Thermostat Wire Length

 

 

 

 

 

 

 

 

 

 

 

 

2-wire (heating)

4 or 5-wire (cooling)

 

 

 

 

 

 

 

 

 

 

24

 

 

55 ft.

 

25 ft.

 

 

22

 

 

90 ft.

 

45 ft.

 

 

20

 

 

140 ft.

 

70 ft.

 

 

18

 

 

225 ft.

 

110 ft.

* Time-delay fuses or HACR-type circuit breakers are required.

Table 10. Electrical Data

Field Supplied

Field Supplied

Fused Service

Panel Connector

Panel

 

 

Black (Hot)

Black

Black

White (Neutral)

White

White

Green or Bare

 

 

(Ground)

 

Ground

Ground

 

Field Supplied Disconnect

Within Sight of Furnace

 

 

 

 

 

 

 

 

 

Field Line Voltage

 

 

 

 

Black

Wiring

 

 

 

 

Factory Line

 

 

 

 

White

 

 

 

 

 

 

 

 

 

 

Voltage Wiring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ground

 

 

 

 

 

 

 

Junction Box (may be internal

or external to the furnace). These connections can be made in the field supplied disconnect at the furnace.

Figure 26. Line Voltage Field Wiring

25

Page 25
Image 25
Nordyne M3RL installation instructions Verify proper operation after servicing