CDE68 1 Part 2 - Installation

5.Carefully position a 2% inch long piece of shrink tubing or tape on the bare sensor shield wire %-inch from the end as shown in Figure 2-6 to insulate and distinguish it from the inner shield wire. Doing this exposes X-inch of bare shield wire beyond the tubing or tape for connection purposes.

6.Carefully position a l-inch long piece of shrink tubing or tape on the cable as

shown in Figure 2-6 to secure all wires.

Do not fold back the cellophane binder exposed in step 4.

7. Using an ohmmeter or test light, verify that the sensor shield wire you insulated is not shorted to the bare inner shield wire. If the wires are shorted, cut the cable to get a new unfinished end and start over at step 1.

8. Strip % inch of insulation from the ends of the red, black, white, and blue wires. Tin these leads, the insulated sensor shield wire, and the bare inner shield wire with solder.

9. Connect the interconnect cable to the analvzer in the same wav as the sensor,

I

cable, by matching colors as indicated.

_.250Typ

L6.41

SENSORSHIELD

RED(DRIVE)

BLACK(SENSE)

WHITE(TEMP +)

uEtS(TEMP-)

INNERIELDSH

OUTERABLECJACKETBAREINNERIELDWIRESH

OUTERSHlELOFOlL-

CELLOPHANEINDER B INNERSHIELOFOIL

ALLOlMSNCHI]mm[

Figure 2-5. Interconnect Cable Termination Details

3.3Connecting Interconnect Cable

To Analyzer: Refer to the instrument instruction manual and connect the interconnect cable wires to appropriate SENSOR terminals in the same way as the sensor wires would be directly connected.