Putting of gasket (LCD)

The line of the remainder is put on hinge (R) side.

Hinge (R)

Putting of LCD damper(C)

Rib application putting of LCD front case 01mm

Put on hinge (R) surely.

Gasket (LCD)

Externals suiting of reflector 01mm

Put the reflector part surely.

LCD Damper(C)

Plinth externals match 01mm

Rib edge match of LCD front case 01mm

Rib application putting of LCD front case 01mm

Putting of LCD Hook Cushion

 

 

 

 

 

Specificatione affixation of LCD Hook Cushion

pressure is applied to

 

double-sided tape portion

 

 

 

 

 

0

0.5mm

0

0.5mm

 

 

 

K502

 

 

 

Hook is attached

 

 

 

 

to the left

 

 

 

 

 

 

K70

 

0

0.5mm

 

 

0

0.5mm

 

 

Drawing out specification of LCD cable

Putting of conductive cloth of LCD cable

LCD Cable (Touch Panel)

 

LCD Cable (Inverter)

703mm

The cable is processed under the shaft .

Note:It is confirmed that the cable does not narrow between cabinets.

Conductive cloth is wrapped (Leave the half)

37

Page 39
Image 39
Panasonic CF-T4HWETZBM service manual Putting of gasket LCD