2.Attachment preparation of Key Board 2-1. Putting of Heat Sheet KB Large

Inclination is set to 0.5mm or less.

Touch the KB hole

Inclination is set to 0.5mm or less.

Touch the KB hole

2-2. Putting of tape

0

0.5mm

 

 

 

 

 

 

 

 

0.5

1.5mm

0

1mm

8

1mm

0

1mm

0.5

1.5mm

 

 

 

 

 

 

 

 

Tape(KBD)(KBD)

KeyBoard exterior and FPC are parallel.

3.Screw tightening of bottom case (1)

The keyboard is inserted, and after the keyboard hooks are inserted in order of a and b while holding the keyboard, the screw tightening is done in the following order.

Note:The sheet metal must not run aground on the rib (Refer to the figure below). 2-1. DXHM0039ZA(D:N5) is tightened. No.1 to No.7

2-2. DXHM0057ZA(G:N7) is tightened. No.8 to No.12

Screw(G)

Screw(D)

Keyboard Hook b

 

 

Screw(D)

Screw(D)

 

 

 

 

 

 

Screw(D)

 

Screw(D)

 

 

Screw(D)

 

 

 

 

 

 

 

Screw(D)

 

Keyboard Hook a

 

 

 

 

 

 

 

 

 

Keyboard

OK

Screw(G)

 

 

Hook

Top Case Rib

 

 

 

 

 

 

 

 

Top Case

 

 

 

 

NG

Screw(G)

 

 

 

 

Screw(G)

 

Screw(G)

Assembly reference chart

 

 

41

Page 43
Image 43
Panasonic CF-T4HWETZBM service manual Putting of tape