16

 

 

 

 

 

TIGHTEN

7

 

 

 

 

 

 

TIGHTEN

 

 

 

 

 

 

11

 

 

 

 

 

TIGHTEN

 

 

 

 

 

 

 

1/2

1

1/2

1/2

3

1/2

 

0

 

1

2

4

FIGURE 17

 

 

10

 

 

 

 

 

 

 

 

 

STEP 17

Securely tighten all loose frame connections made to this point.

Tighten the:

REAR UPRIGHT (16) to the BASE (10).

FRONT UPRIGHT (11) to the BASE (10).

TOP BOOM (7) to the REAR UPRIGHT (16).

and the TOP BOOM (7) to the FRONT UPRIGHT (11).

13

Page 13
Image 13
ParaBody 400102 manual Tighten