AMX NXT-1200V manual Cable Installation for the MP-TP12 Back Box, Finalizing the installation

Models: NXT-1200V

1 196
Download 196 pages 6.82 Kb
Page 45
Image 45
Cable Installation for the MP-TP12 Back Box

Installation Procedures: NXD-1200V Panels

DO NOT REMOVE

Twelve

Finalizing the installation #6-32 securing

screws

MB-TP12 back box

VERIFY THE LENGTH AND LOCATION OF THE INSERTED CABLES. ONCE THE Connector Opening

Strain relief grommet (Clip facing up) Rim of the strain relief grommet should lie flush against enclosure

Securing hole locations (3 on each side) STRAIN RELIEF GROMMET IS CLOSED, IT IS DIFFICULT TO RE-OPEN.

Internal panel casing

Four (pan-head) Housing Screws Manual background

Rear plastic cover Manual backgroundManual background

Four (#8-32) screws

FIG. 33 Location of the attachment screws on the NXD back box and VESA housing

Cable Installation for the MP-TP12 Back Box

1.Connect the cable connectors (RJ-45, Ethernet, and any other audio/video wiring) to their respective locations along the side of the touch panel.

2.Thread the incoming cables through the strain relief grommet opening on the rear plastic cover (FIG. 33).

Finalizing the installation

1.Gently place the rear plastic cover over the NXD panel (with LCD and MB-TP12 back box).

2.Insert the protruding cables, coming out from the opening on the rear plastic cover, into the open strain relief grommet.

3.Allow some slack/length on these cables as a service loop. This service loop provides enough cable length so you can later remove the NXD (with connected cables) from the rear plastic cover.

VERIFY THE LENGTH AND LOCATION OF THE INSERTED CABLES. ONCE THE

STRAIN RELIEF GROMMET IS CLOSED, IT IS DIFFICULT TO RE-OPEN.

4.Carefully apply pressure to close the strain relief grommet over the desired cable location.

1200V Modero Video Touch Panels

35

 

 

Page 45
Image 45
AMX NXT-1200V manual Cable Installation for the MP-TP12 Back Box, Finalizing the installation