![](/images/new-backgrounds/1142745/14274519x1.webp)
11.Set up SNMP local management (see Setting Up Local Management at the Central Site on page 13).
12.Set up the modem, and the Call Directories if trap
13.If the unit is equipped with an ISDN DBM, set up the DBM (see Setting Up the ISDN DBM on page 16).
14.If SNMP traps are wanted, set up managers, select the desired traps, and configure trap
15.Save the configurations.
16.Verify the entire path from the remote unit to the NMS is functioning (see Verifying the
17.If the
18.Install the modem cable (see Connecting the Modem on page 21).
19.If the unit is equipped with an ISDN DBM, install the ISDN DBM cable (see Connecting to ISDN on page 21).
20.If the FrameSaver SLV
21.Install the DTE cables (see Connecting to a DTE on page 22).
22.Verify that data is being received (see Verifying That Data is Being Received on page 24).
23.Verify that all PVCs, including Management PVCs, are configured; and see whether the PVC is active or not (see Checking PVC Connections on page 25).
24.Verify the setup for backup, if applicable (see Verifying the ISDN Line and That Data Can Be Passed Between DBMs on page 26).
The FrameSaver installation is complete.
10