PATTON ELECTRONICS CO. | 3040/V35 | INSTALLATION AND OPERATIONS MANUAL |
139001UA
DTR / DSR Forced Active (JP8 thru JP12)
DTR is tied to DSR on each of the
Channel | Jumper | Channel | Jumper |
Master | JP8 | 3 | JP11 |
|
|
|
|
1 | JP9 | 4 | JP12 |
|
|
|
|
2 | JP10 |
|
|
|
|
|
|
FACTORY Test Jumpers (JP1, JP2 and JP3)
The three test jumpers JP1, 2 and 3, must be installed for the unit to properly function. These jumpers are used in the manufacture and test of the product prior to shipment.
SETUP & INSTALLATION |