PATTON ELECTRONICS CO.

3040/V35

INSTALLATION AND OPERATIONS MANUAL

139001UA

Caution, Disconnect the POWER Before Removing The Cover Vorsicht, Befor Deckung Abnehmen Mach Strom Zu.

CHAPTER 2 - SETUP AND INSTALLATION

Power Connection

Before connecting the 3040/V35 (CTS MD-V.35/TCB) to a AC power source the top cover must be installed and secured with the supplied #8-32 screws. The unit is supplied with a 110/

220VAC voltage switch, turn the switch with

 

110 / 220VA Switch

 

 

a coin or screw driver to the appropriate

 

Fuse Drawer

 

 

voltage for your country. EXAMPLE: In

WARNING: FOR CONTINUED PROTECTION

110

220

the United States of America; set to

AGAINST RISK OF FIRE, REPLACE ONLY

 

WITH SAME TYPE AND RATING FUSE.

 

 

110VAC. The unit is supplied with a

 

 

PORT 4

MASTER DTE/ DCE

 

 

IEC power connector next to the

 

 

 

 

voltage select switch, plug the power

 

 

 

 

cord into the connector until it is firmly

 

IEC Power Connector

 

 

seated. You may now connect the

 

 

 

 

 

 

 

power cord into your AC outlet.

 

 

 

 

Factory Configuration Switch Settings

The 3040/V35 (CTS MD-V.35/TCB) is configured prior to shipment with the switches set to the following default positions:

Switch 15 - 1,2,3, 4 and 8 to OFF, 5, 6 and 7 to ON.

No Data Time Out = 2048 bits

Internal Baud Rate = 56000

Chassis Ground not connected to Signal Ground

Switch 16 - All to ON.

CTS Delay = No Delay

Sync Mode

Contention Mode = Priority

Fallback Clock = Disabled

Fallback Clock Mode = Data Transitions

Fallback Clock Source = Internal Baud Rate Generator

Switch 17 - All to ON.

TX Clock Source = Master pin 15

Sub-Channel Activity Indicated by Interface Control (RTS/DCD)

2-1

SETUP & INSTALLATION

Page 9
Image 9
Patton electronic 3040/V35 manual Switch 16 All to on