Pelco c1943m Installation, Direct RACK-MOUNT HOOK-UP, Remote Operation, Daisy-Chaining

Models: c1943m

1 20
Download 20 pages 20.41 Kb
Page 16
Image 16

INSTALLATION

Physical installation of the VCRC-P unit is relatively simple, although various configurations are possible.

DIRECT RACK-MOUNT HOOK-UP

Regardless of the location of a VCRC-P unit, it will more than likely be installed in a rack (refer to Figure 14). The VCRC-P unit mounts in a standard 19-inch (48.26 cm) rack and occupies only one RU (1.75 inches or 4.45 cm) of rack space.

REMOTE OPERATION

If it is desired or necessary to place the VCRC-P unit some distance from the controller (CM9760-CC1), the wiring run from the CC1 to the RJ-45 IN port should not exceed 4,000 feet (1,219 m).

STANDARD 19-INCH (48.26 CM) RACK MOUNT

Figure 14. CM9760-VCRC-P Rack-Mount Installation

DAISY-CHAINING

Up to 39 VCRC-Ps can be daisy-chained together. This enables the system to support up to 2,496 VCRs. Figure 15 illustrates the required wiring connections for daisy-chaining.

Note that the remarks made in the previous section regarding RS-422 wiring run distances also applies here when considering cables distance runs between daisy-chained units.

UNIT 1 CM9760-VCRC-P

 

 

 

 

 

 

 

 

 

 

UNIT 2

 

UNIT 3

CM9760-VCRC-P

 

CM9760-VCRC-P

 

 

 

 

 

Figure 15. Daisy-Chain Configuration

UNIT 39 CM9760-VCRC-P

16

Pelco Manual C1943M (9/99)

Page 16
Image 16
Pelco c1943m operation manual Installation, Direct RACK-MOUNT HOOK-UP, Remote Operation, Daisy-Chaining