Installation Instructions 3 - 1
3 INSTALLATION INSTRUCTIONS

3.1 INTRODUCTION

This section contains instructions for the followin
g
:
• inspectin
g
the contents of the shipment for completeness and/or dama
g
e
durin
g
transport (initial inspection)
• ensurin
g
the safety of the operator
• installin
g
the power supply
•makin
g
the input and output connections
• performin
g
the installation acceptance checks

3.2 INITIAL INSPECTION

Inspect the contents of the shipment for completeness and note whether any
dama
g
e has occurred durin
g
transport. If the contents are not complete, or if there
is dama
g
e, inform your FLUKE Sales and Service Center so that repair or
replacement of the instrument can be arran
g
ed.
Pay special attention to the followin
g
parts :
accessories to be supplied (refer to Appendix A).
front panel keys and display.
rear panel connectors and terminal blocks.
cabinet surfaces.
The shipment must contain one power supply plus the accessories supplied. For
a complete list of accessories supplied, refer to the INITIAL INSPECTION pa
g
e
in the front of this manual.

3.3 OPERATOR SAFETY INSTRUCTIONS

The instrument has been desi
g
ned and tested in accordance with IEC Publication
1010 for Class 1 instruments and has been supplied in a safe condition. This
Operation Manual contains WARNING and CAUTION statements, that must be
followed by the user to ensure safe operation and to keep the instrument in a safe
condition.