Polycom 725-78600-002A2 manual Site Preparation, post rack assembly consists

Models: 725-78600-002A2

1 32
Download 32 pages 63.98 Kb
Page 15
Image 15

Site Preparation

Polycom Digital Signage Server Hardware Setup

 

 

Hardware Kit: screws, cone washers, and cage nuts (from left to right)

8 (Eight) M5 x 12 flat head screws

2 (Two) 10-32 x 3/4” pan head screws

22 (Twenty-two) M4 x 4 truss head screws

8 (Eight) M5 x 12 cone washers

10 (Ten) M5 Cage nuts

NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit.

The 4-post rack assembly consists of:

A set of long, fixed rack brackets that attach directly to the rack itself.

A set of medium-sized adjustable rack brackets that attach to the long, fixed rack brackets.

The 2-post rack assembly consists of:

A set of long, fixed rack brackets.

Three sets of short rack brackets that attach to the long fixed rack brackets. One of these sets has threaded holes (for placement in the front) to allow the appliance to be secured in the rack.

Site Preparation

Setup location, rack and appliance precautions

Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer.

Polycom, Inc.

11

Page 15
Image 15
Polycom 725-78600-002A2 Site Preparation, post rack assembly consists, Setup location, rack and appliance precautions