in squares in lower left picture and allow the main unit to slide down the winding grooves in the wall mount backpack - originally the base box. The stand assembly is not engaged in wall mount operation. Connect all cables coming out of the backpack into the cable cover area of main unit.
The area required for wall mount application is determined by the main unit dimensions and is 375 mm in width and 315 mm in height.
BASE MOUNT UPGRADE KIT
On rear edge of the stand assembly, there is a rear connect cover. Either a 12” 2nd LCD display panel option
12” 2nd LCD Panel Or Customer Display This rear connect cover can be removed
with metal chassis assembled in the base cover. Refer to the inside view of the base unit after
removal of UPS battery bracket at right use a flat head screwdriver to pick the plastic hook plate of the rear connect cover from inside to remove the cover.
Fit the latest base of
6201, please first route its cable through this opening and have it pass the passage arrowed in left picture. For
normal cable exit (under the joint base) as in the right picture.
Fit 2 screws through washers to hold the joint tight. For low profile customer display
15” 2nd LCD Panel
A bracket kit including a steel bracket and 2 types of screws as in the left picture will be provided with the 15” 2nd LCD panel. Use 3 smaller screws to fix the bracket to outside of
the bottom plate from inside as circled in the below left picture that is the bottom view of the base stand. Then use the 4 larger screws to fix the monitor support rod from bottom as arrowed in the same picture. The overall assembly
Part 8