POSIFLEX Business Machines TP/LT- 5600, TP/LT- 5700 Routing The Cables, Preparing The Main Unit

Models: TP/LT- 8000 TP/LT- 5800 TP/LT- 5700 TP/LT- 5600

1 20
Download 20 pages 40.61 Kb
Page 9
Image 9
ROUTING THE CABLES

will look like the right picture. Route the VGA through the cable exit of the base stand to the main unit. Connect the attached power adaptor for its

power source.

ROUTING THE CABLES

Place all the cables required for connections to the main unit except those for the integrated attachment through the front part inside the stand assembly. Be sure not to damage any cable during this operation.

Route Cables through Front Part Connect this End to Main Unit

Now, turn the adjustable stand assembly back to normal orientation and arrange all cables to come out of the area for mounting main unit from the bottom edge for ease of later operation.

PREPARING THE MAIN UNIT

On the back of the main unit, there are 4 matching pegs and a service window. Push open the service window in the direction as indicated in the picture, one can find a button cell battery socket and several jumpers for some technical settings. Please note that only those qualified technicians may adjust in the service window with information from Posiflex and the contents in the service window may change without notice as time develops.

Service Window

4 Matching

Push Open To

Pegs

 

The Right

 

Li Battery

 

 

 

CAUTION

Risk Of Explosion If Battery Is Replaced By An Incorrect Type

Dispose Of Used Batteries According To Local Regulations

This battery socket accepts a 3 V button cell Lithium battery (CR2032) required to support the system real time clock. The used up batteries must be recycled and disposed of under guidance of local legislations. The jumpers in this window are designated for VGA port and COM port power supply function. Please consult your dealer for technical support on setup of these jumpers. A new Lithium battery can support the system RTC for about 3 years.

Part 9

Page 9
Image 9
POSIFLEX Business Machines TP/LT- 5600, TP/LT- 5700, TP/LT- 8000, TP/LT- 5800 Routing The Cables, Preparing The Main Unit