Diagram 3

Plug

 

connector

 

into lower

 

board

Ribbon cable receptacle

 

Ribbon cable connector

 

Flanged nuts (A)

 

Base plate

 

Motor chassis

 

Cross beam

 

9.Route the ribbon cable as shown in Diagram 3, so that you have easy access to the receptacle on the motor chassis.

10.Align the tab on the ribbon cable connector with its counterpart located on the receptacle in the motor chassis. Plug the connector into the receptacle. See Diagram 3. The plastic flanges on the receptacle should clip onto the connector when you plug it in. Since the connector is designed to engage in one direction only, do not force the connector into the receptacle.

11.Have your assistants help you return the treadmill to an upright position, so that the base is flat on the floor.

Diagram 4

Install upper

 

handrail

 

clamp

Handrail clamp

External star washers (E)

Handrail console screws (B)

Lift column

Ribbon cable

Incline crank shaft (M9.1 only)

12.Place two external star washers (E) onto two of the upper handrail console screws (B) and align the upper handrail clamp with the mounting holes on the lift column. See Diagram 4.

13.Insert the screws (B) through the handrail clamp and into the lift column. Tighten the screws securely with the hex key (F) provided.

14.Carefully route the ribbon cable through the slot on the left-hand side of the handrail clamp.

Note: Right and left are determined while standing to the rear of the treadmill facing toward the hood.

15.If your hands are dirty, wash your hands before continuing to the next step. This will help keep the electronic console display clean.

page 5

Page 11
Image 11
Precor M9.1, M9.2s owner manual Plug, Board, Flanged nuts a Base plate Motor chassis Cross beam, Handrail, Clamp