Installing the Console

33

Completing the Console Installation (P30 and P20)

Before you complete the final installation steps, double-check the connections you have made. Make sure that all cables are fully and securely connected, and that any unneeded cables are tied back properly.

To complete the installation:

1.Feed extra cable back into the neck tube.

2.Tilt the control console backward (toward yourself) until the tab on the top edge of its back plate slides along the top edge of the console mount and the screw holes align properly.

3.Insert the four ⁵₈-inch flat head screws through the holes in the console mount and thread them into the holes in the back plate on the console. Partially tighten the screws using a ⁵₈-inch hex wrench.

4.Line up the two small tabs at the bottom of the console’s back cover with the slots at the bottom of the console case. Insert the tabs into the slots.

5.Insert the two #8–32 x ¹₂-inch Phillips-head screws that you removed earlier into the holes at the top edge of the console’s back cover. Tighten the screws fully.

Important: Use caution not to pinch the cables between the back cover and PVS mounting screw heads.

6.Fully tighten the four mounting screws (partially tightened in step 3) using a ⁵₃₂-inch hex wrench.

Verifying That the Heart Rate Display Is Operational

To verify that the heart rate display is operational:

1.Begin exercising on the equipment.

2.Grasp both touch-sensitive handlebars.

Note: The heart rate is read within ten seconds. During that time, the heart on the display flashes.

3.Look at the HEART RATE display. After a few seconds, a number appears indicating your heart rate.

4.If a number does not appear in the HEART RATE display, check the cable connection to make sure it is properly connected.

Page 87
Image 87
Precor P30 Console Completing the Console Installation P30 and P20, Verifying That the Heart Rate Display Is Operational