VTrak M610i, M310i, M210i Quick Start Guide

VTrak Installation Task List

Step 1: Unpacking the VTrak (below)

Step 2: Mounting VTrak in a Rack (page 5)

Step 3: Installing Disk Drives (page 10)

Step 4: Making Management and Data Connections

Step 5: Making Serial Cable Connections (page 15)

Step 6: Connecting the Power (page 16)

Step 7: Setting the IP Address (page 18)

Step 8: Creating Disk Arrays with WebPAM PROe (page 24)

For complete information about your VTrak E310f/s subsystem, see the VTrak M610i, M310i, M210i Product Manual on the CD.

Step 1: Unpacking the VTrak

The VTrak box contains the following items:

VTrak Unit

• Screws for disk drives

Quick Start Guide

(36 for M210i; 52 for M310i; 70 for

M610i; including 4 spares)

Null Modem Cable

• 1.5m (4.9 ft) Power cords (2 for US

• Left and right center-mount

and 2 for Europe)

 

brackets

 

• CD with SNMP files, Product

• Left and right mounting rails

Manual and Quick Start Guide

 

 

Warning

The electronic components within the VTrak disk array are sensitive to damage from Electro-Static Discharge (ESD). Observe appropriate precautions at all times when handling the VTrak or its subassemblies.

Important

Use the following categories of network cables with VTrak:

Cat 6, preferred

Cat 5E, minimum

2

Page 2
Image 2
Promise Technology VTM310i, VTM610i, VTM210 quick start VTrak Installation Task List, Unpacking the VTrak