VTrak M610i, M310i, M210i Quick Start Guide
2
VTrak Installation Task List
Step 1: Unpacking the VTrak (below)
Step 2: Mounting VTrak in a Rack (page5)
Step 3: Installing Disk Drives (page10)
Step 4: Making Management and Data Connections
Step 5: Making Serial Cable Connections (page15)
Step 6: Connecting the Power (page16)
Step 7: Setting the IP Address (page18)
Step 8: Creating Disk Arrays with WebPAM PROe (page24)
For complete information about your VTrak E310f/s subsystem, see the VTrak
M610i, M310i, M210i Product Manual on the CD.

Step 1: Unpacking the VTrak

The VTrak box contains the following items:
•VTrak Unit
•Quick Start Guide
Null Modem Cable
Left and right center-mount
brackets
Left and right mounting rails
Screws for disk drives
(36 for M210i; 52 for M310i; 70 for
M610i; including 4 spares)
1.5m (4.9 ft) Power cords (2 for US
and 2 for Europe)
CD with SNMP files, Product
Manual and Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Important
Use the following categories of network cables with VTrak:
Cat 6, preferred
Cat 5E, minimum