R

Castile & Santa Fe CE Insert

B. Full Reline With Vertical Outside Air

NOTE: Check clearances carefully for this type of installation to ensure adequate room for outside air venting.

CAUTION

Check building codes prior to installation.

Installation MUST comply with local, regional, state and national codes and regulations.

Consult local building, fire officials or authorities having jurisdiction about restrictions, installation inspection, and permits.

12” (305mm) min. above

12” (305mm) min. below

12” (305mm) min. above

12” (305mm) min. below

NOTE; Use metal plate around exhaust vent pipe and seal all edges with non-flammable insulation such as mineral wool or ceramic.

Do not use high temperature caulk- ing materials to seal any edge to prevent future serviceability

Outside Air

Termination

at Chimney Top

NOTE; Use metal plate around exhaust vent pipe and seal all edges with non-flammable insulation such as fiberglass, mineral wool or ceramic.

Do not use high temperature caulk- ing materials to seal any edge to prevent future serviceability

Outside Air

Termination

at Chimney Top

Figure 29.1

Figure 29.2

October 27, 2011

7069-101B

Page 27

Page 27
Image 27
Quadra-Fire CASTILEI-CE-MBK, SANTAFEI-CE-MBK owner manual Outside Air Termination At Chimney Top