R

Castile & Santa Fe CE Insert

B. Thermostat Location

The thermostat’s location will have some effect on the appliance’s operation.

When the thermostat is located close to the appliance, it may require a slightly higher temperature setting to keep the rest of the house comfortable.

If the thermostat location is in an adjacent room or on a different floor level, you will notice higher temperatures near the appliance.

C. Tools And Supplies Needed

Tools and building supplies normally required for instal- lation.

E. Pre-Burn Check List

1.

Place the appliance in a location near the

 

final installation area and follow the proce-

 

dures below:

2.

Open the appliance and remove all the parts

 

and articles packed inside the Component

 

Pack. Inspect all the parts and glass for ship-

 

ping damage. Contact your dealer if any irregu-

 

larities are noticed.

3.

All safety warnings have been read and fol-

 

lowed.

4.

This Owner’s Manual has been read.

5.

Floor protection requirements have been met.

6.

Venting is properly installed.

Reciprocating Saw

Hammer

Phillips Screwdriver

Tape Measure

Plumb Line

Level

Framing Material

Hi-temp Caulking Material

Gloves

Safety Glasses

7/16 inch Socket Wrench (or 10mm 6 pt or 11mm 6 pt socket)

Framing Square

Electric Drill & Bits

Self-Tapping Screws Outside Air Required Class L or PL Pellet Vent

May also need: Vent Support Straps

7.

The proper clearances from the appliance and

 

chimney to combustible materials have been

 

met.

8.

The masonry chimney is inspected by a profes-

 

sional and is clean, or the factory built metal

 

chimney is installed according to the manufac-

 

turer’s instructions and clearances.

9.

The chimney meets the required minimum

 

height.

10.

All labels have been removed from the glass

 

door.

D. Inspect Appliance and Components

WARNING! Risk of Fire! Damaged parts could impair safe operation. Do NOT install damaged, incomplete or substitute components.

Open the appliance and remove all the parts and articles packed inside the Component Pack. Inspect all the parts and glass for shipping damage.

Report to your dealer any parts damaged in shipment.

All labels have been removed from the glass door.

Plated surfaces have been wiped clean with a soft cloth, if applicable.

Read all the instructions before starting the installation.

Follow these instructions carefully during the installation to ensure maximum safety and benefit.

Follow pipe manufacturer instructions for installation and air clearance requirments.

11.

Plated surfaces have been wiped clean, if

 

applicable.

12.

Thermostat or remote has been installed.

13.

A power outlet is available nearby.

October 27, 2011

7069-101B

Page 19

Page 19
Image 19
Quadra-Fire CASTILEI-CE-MBK, SANTAFEI-CE-MBK Castile & Santa Fe CE Insert Thermostat Location, Tools And Supplies Needed