Quartz 500 operation manual Setting, Preparation for setting, Key hole Panel house Display

Models: 500

1 34
Download 34 pages 12.23 Kb
Page 10
Image 10

5. SETTING

Preparation for setting

To prepare for setting:

1 Unlock the unit. While holding down

2 Remove the panel cover.

the panel, open buttons at both sides of the

 

unit and lift the panel cover away from

 

you.

 

 

Panel open button

Panel cover

(at both sides of the unit)

 

Key hole

Panel house

Display

Control button

3 Make settings using the display and control buttons at the panel house.

Be sure to make settings with the power on.

Upon opening the panel cover, the PAY ENDING button lights up and the unit is in the pay ending setting mode.

Make sure to press SET at the completion of each setting. Contents are NOT stored in memory if SET is not pressed.

8

Page 10
Image 10
Quartz 500 operation manual Setting, Preparation for setting, To prepare for setting Unlock the unit. While holding down