Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
0180B Type H manual Vent Damper
Models:
0180B Type H
1
14
40
40
Download
40 pages
26.78 Kb
11
12
13
14
15
16
17
18
<
>
Troubleshooting
Specifications
Install
Parts list
Piping Diagrams
Adjustment & Replacement of Components
Warranty
Electrical Wiring
Heat Exchanger Re-assembly
Servicing Procedures
Page 14
Image 14
VENT DAMPER
14
Page 13
Page 15
Page 14
Image 14
Page 13
Page 15
Contents
Do not try to light any appliance
Models 0042B, 0066B, 0090B 0135B & 0180B - Type H
WHAT TO DO IF YOU SMELL GAS
INSTALLATION & OPERATING INSTRUCTIONS
Page
GENERAL SPECIFICATIONS
CONTENTS
TROUBLESHOOTING
INSTALLATION
DANGER
WARNINGS
Pay Attention to These Terms
WARNING-CALIFORNIAPROPOSITION
GENERAL SPECIFICATIONS
RECEIVING EQUIPMENT
Input
Heating
Piping Connections
Capacity
Mounting Base
INSTALLATION
Code Requirements
Clearance Requirements
Sq. in. of Free Area
Combustion/Ventilation Air
Model No
Model No
Vent
Venting Connections
Connector
Model No
H Min. ft
Common Vents
Roof Pitch X/12
Vent Damper Installation Location
Mounting
Vent Damper Operation
Flair Damper
VENT DAMPER
Water Connections & System Piping
Gas Supply Connections
Gas Pressure
Setting
Max. System
Model No
System Flow
Head ft/WC
Feed Expansion Tank
Piping Diagrams
12” Max Air Vent Air Scoop Diaphragm
Valve Pipe Pressure Relief Valve to Drain
Electrical Wiring
Wiring Diagrams
Page
Page
Fig. 19 Dual-ZoneHoneywell Valve
Fig. 17 Single-ZoneTaco Valve
Fig. 18 Dual-ZoneTaco Valve
Fig. 21 Power Vent System with Zone Valve
Fig. 20 System with Three 3 Zone Pumps
Fig. 22 Primary/Secondary Pumping System Honeywell Zone Valve
Fig. 24 IID Units with Low Water Cut-offDevice
General Location of Controls
SERVICING PROCEDURES
SEQUENCE OF OPERATION
Intermittent Ignition Device IID
For Standing Pilot Models
START-UP PROCEDURES
Lighting the Boiler
Filling the System
For Automatic Ignition Models
Models
To Turn Off Gas to the Boiler Models
HONEYWELL PILOT
5.For Honeywell valve Turn gas control knob
Shut-downProcedure
To Turn Off Gas to the Boiler
3.For Honeywell valve
For Standing Pilot Systems
Testing the Ignition Safety Shut-off
Safe Shut-downTests
Limit Action
Procedure for Cleaning Flue Gas Passageways
Inspection Procedures
Low Water Cut-OffWhen Installed
Burners
Heat Exchanger Removal
REPAIR PROCEDURES
Tube Cleaning Procedure Typical
Burner Tray Removal
Heat Exchanger Re-assembly
Combustion Chamber Removal
SOLUTIONS
TROUBLESHOOTING
PROBLEM
CAUSES
10Defective ignition module or defective gas valve
Flame Roll-outSwitch Replacement
Adjustment & Replacement of Components
Gas Valve Replacement
Vent Thermal Switch Replacement
Circulator Replacement
Replacement Parts List
Fast-ResponseTemperature Sensor Probe Replacement
2-StageController Models
ADDITIONAL WARRANTY EXCLUSIONS
LIMITED PARTS WARRANTY
HEAT EXCHANGER WARRANTY
PARTS REPLACEMENT