Raypak 0180B Type H manual Gas Supply Connections, Gas Pressure, Water Connections & System Piping

Models: 0180B Type H

1 40
Download 40 pages 26.78 Kb
Page 15
Image 15
1/2 in. Pipe

Model

1/2 in. Pipe

3/4 in. Pipe

1 in. Pipe

1 1/4 in. Pipe

No.

Nat.

Pro.

Nat.

Pro.

Nat.

Pro.

Nat.

Pro.

 

 

 

 

 

 

 

 

 

 

0042

125

350

500

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0066

60

160

175

460

 

 

 

 

 

 

 

 

 

 

 

 

 

0090

30

80

125

300

400

 

 

 

 

 

 

 

 

 

 

 

 

0135

15

40

60

150

200

450

 

 

 

 

 

 

 

 

 

 

 

0180

 

20

35

90

115

300

425

 

 

 

 

 

 

 

 

 

 

Table H: Maximum Equivalent Pipe Length (Feet)

Gas Supply Connections

The inlet gas connection of the boiler gas valve is 1/2". Provide an adequate gas piping supply line no smaller than 1/2", according to Table H above.

Gas piping must have a sediment trap ahead of the boiler gas controls, and a manual shut-off valve locat- ed outside the jacket. All gas piping should be tested after installation in accordance with local codes.

NOTE: Do not use teflon tape on gas line pipe thread. A flexible sealant suitable for use with Natural and Propane gases is recommended.

These boilers are also certified to operate on propane gas, when equipped with the combination gas valve and orifices (pilot and main burners) sized for propane gas.

Gas Pressure

ManualUnion

Valve

Sediment Trap

Gas Valve

3/4 in. Pipe Must be Supplied by Installer

Fig. 14: Sediment Trap

CAUTION: The boiler and its manual shut-off valve must be disconnected from the gas supply during any pressure testing of that system at test pressures in excess of 1/2 psi (3.45 kPa). Dissipate test pressure in the gas supply line before reconnecting the boiler and its manual shut-off valve to gas supply line. FAILURE TO FOLLOW THIS PROCEDURE MAY DAMAGE THE GAS VALVE. OVER PRESSURED GAS VALVES ARE NOT COVERED BY WARRANTY. The boiler and its gas connections shall be leak tested before placing the appliance in operation. Use soapy water for leak test. DO NOT use open flame.

The gas valve is provided with pressure taps to meas- ure gas pressure upstream of the gas valve and downstream which is the same as the manifold pres- sure.

Gas Type

Inches

Inches

Regulator

WC Min.

WC Max.

Setting

 

 

 

 

 

Natural

7.0

10.5

3.5

 

 

 

 

Propane

12.0

13.0

11.0

 

 

 

 

Table I: Minimum and Maximum Gas Pressure

Water Connections & System Piping

The pipe size for water connections is shown on page

6.Typical piping systems are shown on pages 17 to

This boiler is supplied with a circulator and built-in bypass as standard to ensure the required minimum water flow in the boiler. The bypass on models H-0135 and H-0180 is provided with an adjustable valve that is factory-set in the full open position. The handle is

15

Page 15
Image 15
Raypak 0180B Type H Gas Supply Connections, Gas Pressure, Water Connections & System Piping, ManualUnion Valve, Model