Raypak 0180B Type H Installation, Code Requirements, Mounting Base, Clearance Requirements, Model

Models: 0180B Type H

1 40
Download 40 pages 26.78 Kb
Page 7
Image 7
INSTALLATION

INSTALLATION

Code Requirements

Installation must be in accordance with local codes, or in the absence of local codes, with the latest editions of the National Fuel Gas Code, ANSI Z223.1, and the National Electrical Code, ANSI/NFPA 70. In Canada, installations must conform with the current CSA B149 and the Canadian Electrical Code Part 1 CSA C22.2 No.1. Where required by the authority having jurisdic- tion, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, CSD-1.

Mounting Base

Boiler should be mounted on a level surface. Each boiler is designed with a built-in sub-base approved for mounting the boiler on combustible flooring. Boiler must NOT be installed on carpet.

In addition, the boiler shall be installed such that the gas ignition system components are protected from water (dripping, spraying, rain, etc.) during appliance operation and service (circulator replacement, control replacement, etc.)

NOTE: This boiler should be located in an area where water leakage will not result in damage to the area adjacent to the appliance or to the structure. When such locations cannot be avoided, it is recommended that a suitable drain pan, adequately drained, be installed under the appliance. The pan must not restrict air flow.

Fig. 2: Mounting Base

Clearance Requirements

1.Minimum clearances from combustible materials are listed in Table B below.

2.A front clearance of at least 24" is recommended for adequate service of burner-tray and controls.

Model

Floor

Front

Back

Right

Left

Top

Flue

No.

Vent

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0042

Comb.

4 in.

6 in.

6 in.

6 in.

16 in.

6 in.

0066

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0090

 

 

 

 

 

 

 

0135

Comb.

Alcove

6 in.

6 in.

6 in.

16 in.

6 in.

0180

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table B: Minimum Clearances From Combustible Materials

7

Page 7
Image 7
Raypak 0180B Type H Installation, Code Requirements, Mounting Base, Clearance Requirements, Model, Floor, Front, Back