Index
Index
A
Acceptable central building ground points 31
Acquiring the satellite signal 35 Azimuth setting, adjusting 36
C
Cable, routing into the house 33 through the mast 30
Central building ground 11, 31 acceptable points 31
CH3/CH4 switch 7 Compass, using 9 Connecting the dish to the
G
Ground wire, separating 30 Grounding block 12 Grounding the system
house entry point 31 Grounding wire 32
L
Lap siding mounting option use of a spacer 18
LNB
attaching to the LNB support arm 30
connecting the
P
Phone connection 34 Plastic dish
putting together 14 Precise site survey 9
R
Roof mount
sealing the mounting foot 26 Roof mounting option
considerations 25
receiver 34
D
Dish, final assembly 29 Dish pointing steps 39
E
Elevation setting 14
Elevation angle 9 Elevation nuts 14
Elevation setting, adjusting 37
F
M
Mast, leveling 28 Messenger (ground) wire 30 Metal dish
putting together 14 Mounting options
Brick or poured concrete 19 Hollow or cinder block wass 20 Pole mount 23
Roof 25
Solid wood or lap siding 16
N
National Electrical Code (NEC) 11, 31
S
Site survey 9
Support sleeve 14
T
Troubleshooting
signal acquisition for system test 38
Final Installation 41