INSTALLATION
For PROPANE Units and Units Equipped with DC Spark Boxes*
*For installation of the DC Spark Box refer to the LP Conversion instructions in this manual.
FLUE CONNECTOR INSTALLATION
1)Remove the screw holding the fl ue connector
plate to the appliance.
2) Slide the plate out and attach to the fl ue liner inside the fi replace to the fl ue collar with three sheet metal screws.
3) Place the appliance on the hearth. Push the appliance into the fi replace and at the same time slide the plate back onto the ap- pliance.
4)Replace the screw holding the plate just
before completely pushing the appliance into the fi replace.
Note: Do not operate unit if flue connector is not fastened in original position.
Regency® | 11 |