INSTALLATION
FLUSH LOUVERS | OPTIONAL BAY FRONT | BAY LOUVERS |
1) The Top Louver is held in place by Spring | IMPORTANT |
Clips. Push into place as shown. | Flush glass must stay in place |
| when bay option is used. The bay |
| front is a decorative overlay only. |
1)Install top louver by sliding the two bracket clips into the brackets located on top of the baydoor.Seebelow.Thefittedlouverleaves a small gap between faceplate bottom and louver top.
2)Install the Spring Hinges on the left and right side of the bottom of the Firebox using 2 screws per hinge.
3)Place the Bottom Louver near the hinge. Flip hinge over the Bottom Louver and secure using 3 screws.
Hinge
Location
Bottom Louver
1)Place the bay door onto the 2 pins on the top of the unit.
2)Position 2 magnets on the back of each trim piece close to the ends. Place the top and bottom trim pieces on the bay front.
3)Install top and bottom louvers.
Diagram 1
Note: Top and bottom louvers and brackets are different. See diagram below.
2) Install bottom louver by sliding the two bracket clips into the brackets located underneath the bay door and secure with 2 screws into the bracket on the bottom of the Bay Front as per diagram 1.
NOTE: The top and bottom trim pieces are different.
16 | Regency® |