BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.4 Turbulator Installation

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the BH-125/150/175/200.

 

 

T

 

 

w

 

 

i

Turbulator

 

s

 

t

Section

 

 

 

Turbulator

Tab

 

Adapter

 

 

Turbulator section 2.5'

 

(76.2 cm) (stainless) used in

Fold tab around outside

BH-40 heaters must be in the

section of turbulator nearest

of tube nearest to the vent to

hold turbulator in place.

to the burner.

 

Turbulator Installation

Model

Tube Section

BH-40

1st 10' (3 m) Section

 

 

BH-60

2nd 10' (3 m) Section

 

 

BH-80

2nd 10' (3 m) Section

 

 

BH-100

3rd 10' (3 m) Section

 

 

BH-115

3rd 10' (3 m) Section

 

 

BH-125

N/A

 

 

BH-140

4th 10' (3 m) Section

 

 

BH-150

N/A

 

 

BH-175

N/A

 

 

BH-200

N/A

 

 

Pull String

Description

Part Number

Turbulator Adapter 2.5' (76.2 cm)

03051503

 

 

Turbulator Section 2' (61 cm)

03051504

 

 

Turbulator Section 2.5' (76.2 cm)(Stainless)

03051505

 

 

Tube

91409XXX

 

 

20

Page 6
Image 6
Roberts Gorden Linear Heater manual Turbulator Installation Model Tube Section