14.2 Burner Compartment

UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

14.2 Burner Compartment

Burner

Compartment

14.2.1 Burner Injectors Cover

Viewing port for flame probe

Flame Probe

Ignition Electrode

Remove flexible air duct from spigot

Ensure gas tight fitting of injectors.Ensure correct alignment with burners.Ensure all pipe joints are gas tight.Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background Remove screws and pull off burner cover

The burner compartment is a sealed compartment. Following any work, re-seal the compartment with the gas pipe rubber seal fully in place and all screws fitted and tight.

NOTE: Separated combustion model shown.

14.2.1 Burner Injectors

Inshot

Burners

Orifices Manual backgroundManual background

ManifoldManual background

Mounting

Bracket Grommet

Manifold

Remove manifold

screws and pull

out manifold

ManifoldManual background

Unscrew

Orifices

Marking

Folded

Hem

Ensure gas tight fitting of injectors.

Ensure correct alignment with burners.

Ensure all pipe joints are gas tight.

MODEL

UHD[X][S][R] 75

UHD[X][S][R] 100

UHD[X][S][R] 125

 

 

 

 

Orifice Quantity

5

6

7

 

 

 

 

Natural Gas (G20)

 

 

 

 

 

 

 

Orifice Marking

49

46

46

 

 

 

 

P/N

91930049

91930046

91930046

 

 

 

 

Propane (G31)

 

 

 

 

 

 

 

Orifice Marking

1.15 mm

1.25 mm

1.25 mm

 

 

 

 

P/N

91930115

91930125

91930125

 

 

 

 