UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

Figure 13: Automatic Burner Control Sequence

Burner Sequence for Ignition Control

START

Thermostat 24 V

RUN

SHUT DOWN

Flue Blower

Pressure

 

Switch

C

 

Ignition Spark

Start Gas Valve

Flame Signal

 

30 Seconds Purge*

30 Seconds Post

P

NO

 

 

NC

ts = 10 Seconds

 

 

*Purge time begins at pressure switch change over.

Required Incoming Signals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If at any stage the flame fails, the control will retry

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Signals Output By Control

for ignition. The control has four trials for ignition

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

before a one hour lockout.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 14: Gas Valve

END VIEW

TOP VIEW

Regulator

½PSI C

IN

OFF

Gas Inlet

ON

Outlet

Pressure

Inlet Pressure

Description

Part Number

Gas Valve NG

90032505

Gas Valve LP

90032506

24

Page 30
Image 30
Roberts Gorden UHD[X][S][R] 75, UHD[X][S][R] 125 service manual END View