UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL

SECTION 15: SPECIFICATIONS 15.1 Dimension Data

TOP VIEW

17.63"

 

 

 

 

 

 

 

 

(45 cm)

 

 

 

B

 

 

 

 

 

 

 

4 x 3/8" Captive Nuts

 

 

 

 

Provided

 

 

 

 

Air Intake

 

 

18.25"

 

(UHD[X][S][R] only;

 

16.63"

 

Optional Position)

 

(46 cm)

 

 

 

 

 

(42 cm)

6"

 

Flue

 

 

 

(Optional Position)

 

 

(15 cm)

 

 

 

 

 

 

 

C

 

6.75"

 

 

 

 

 

B

 

 

(17 cm)

 

 

 

 

 

E

 

 

 

 

REAR VIEW

 

 

SIDE VIEW

B

 

 

Flue

20.25"

 

 

E

 

 

( 51 cm)

 

 

 

D

 

 

6"

 

6.75"

 

 

 

(17 cm)

 

A

(15 cm)

 

 

 

 

 

 

 

 

 

A

Air Intake

6"

 

 

 

 

 

 

(UHD[X][S[]R] (15 cm)

 

 

 

only)

Thermostat

 

 

 

 

Connection

 

 

 

Gas Supply

Electrical

 

 

 

 

 

 

 

 

Supply

1.8"

 

 

 

 

 

 

 

1.5"

(5 cm)

 

 

 

(4 cm)

 

 

 

3.3"

 

 

 

 

(8 cm)

 

 

 

28.5"

 

 

 

 

(72 cm)

 

 

 

 

 

Model

UHD

UHD

UHD

 

 

[X][S][R] 75

[X][S][R] 100

[X][S][R] 125

 

 

 

 

 

 

 

 

 

A

Height

in

17.79

23

23

 

(cm)

(45.09)

(58.42)

(58.42)

 

 

 

 

 

 

 

 

B

Duct Connector Flange

in

1.25

1.25

1.25

 

(cm)

(3)

(3)

(3)

 

 

 

 

 

 

 

 

C

Center of Flue [Top Option]

in

5.2

6.9

6.9

 

(cm)

(13.21)

(17.53)

(17.53)

 

 

 

 

 

 

 

 

D

Center of Flue

in

2.5

2.5

2.5

 

(cm)

(6.35)

(6.35)

(6.35)

 

 

 

 

 

 

 

 

E

Minimum Inlet Duct Length

in

32

37

37

 

(cm)

(81.28)

(93.98)

(93.98)

 

 

 

 

 

 

 

 

 

Recommended Mounting Height to Heater Base

ft

12

20

20

 

(m)

(3.66)

(6.10)

(6.10)

 

 

Weight

lb

81

92

97

40

Page 46
Image 46
Roberts Gorden UHD[X][S][R] 75, UHD[X][S][R] 125 service manual Specifications 15.1 Dimension Data, TOP View