TABLE OF CONTENTS

SECTION 1: Heater Safety

1

SECTION 10: Operation and Maintenance

23

1.1 Manpower Requirements

1

10.1

Pre-Start-Up Checks

23

SECTION 2: Installer Responsibility

2

10.2

Begin Start-Up

23

2.1

Wall Tag

2

10.3

Complete Start-Up

25

2.2

Corrosive Chemicals

2

SECTION 11: User Instructions

26

2.3

National Standards and Applicable Codes

2

11.1 User Instructions

26

SECTION 3: Critical Considerations

3

11.2 Heater Operation

26

3.1

Basic Information

3

11.3 Common User Controls

26

3.2

Manufactured Units

3

11.4 Lighting Instructions

26

3.3

Location and Suspension

3

11.5 Simple Troubleshooting

27

3.4

Minimum Required Installation Clearances

3

SECTION 12: Servicing

28

3.5

Clearances to Combustibles

3

12.1

Servicing Instructions

28

3.6

Ventilation

4

12.2

Burner Maintenance

28

3.7

Gas Supply

4

12.3

Heat Exchanger Maintenance

28

3.8

Electrical Supply

4

12.4

Gas Valve Maintenance

28

3.9

Vent

4

12.5

Flue Blower

28

SECTION 4: National Standards and Applicable Codes

5

12.6

Venting and Air Intake Pipe

28

4.1

Gas Codes

5

12.7

Maintenance Checklist

29

4.2

Aircraft Hangars

5

SECTION 13: Troubleshooting

31

4.3

Parking Structures and Repair Garages

5

13.1

General

31

4.4

Electrical

5

13.2

Troubleshooting For Automatic Ignition Burner

 

4.5

Venting

5

 

Systems

32

4.6

High Altitude

6

13.3

Troubleshooting for Flame Supervision System

33

SECTION 5: Duct Heater Installation

7

13.4

Troubleshooting for Gas Valves

34

5.1

General

7

13.5

Troubleshooting for Flue Blower

34

5.2

Shelf Mounting and Suspension

8

SECTION 14: Replacement Parts

35

5.3

Wall Mounting

8

14.1

Gas Valve

35

SECTION 6: Venting

10

14.2

Burner Compartment

36

6.1

Changing Vent and Air Intake Orientation

10

14.3

Ignition Electrode and Flame Probe

37

6.2

Venting

10

14.4

Heat Exchanger

37

6.3

Vent Installation

10

14.5

Flue Blower Vertical Installation

38

6.4

Unvented Operation

11

14.6

Pressure Switch

39

6.5

Horizontal Venting

11

14.7

Ignition Control

39

6.6

Vertical Venting

11

14.8

Limit Switches

39

6.7

Length Requirements

11

SECTION 15: Specifications

40

6.8

Vent Material

12

15.1

Dimension Data

40

6.9

Replacing an Existing Heater in a Venting System ....

12

15.2

General Technical Data Table

41

SECTION 7: Air Supply

17

15.3

Technical Data Table

41

7.1 Separated Combustion Installation

17

SECTION 16: ROBERTS GORDON® COMBAT® UHD-Series

7.2 Unvented Installation

17

 

Warranty

43

7.3 Building Ventilation

17

 

 

 

7.4 Outside Combustion Air Supply

17

 

 

 

SECTION 8: Gas Piping

18

 

 

 

8.1

Connections

18

 

 

 

SECTION 9: Wiring

19

 

 

 

9.1

Positioning Thermostats

19

 

 

 

9.2

Low Voltage Thermostat with One Heater

19

 

 

 

9.3

Internal Wiring Diagram

20

 

 

 

9.4

Ladder Wiring Diagram

21

 

 

 

9.5

Electrical Connection to the Heater

22

 

 

 

©2008 Roberts-Gordon LLC

All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Roberts-Gordon LLC.

Printed in U.S.A.

Page 3
Image 3
Roberts Gorden UHD[X][S][R] 125, UHD[X][S][R] 75 service manual Roberts-Gordon LLC