Roberts Gorden UHD[X][S][R] 125, UHD[X][S][R] 75 Heater Safety, Manpower Requirements

Models: UHD[X][S][R] 125 UHD[X][S][R] 75

1 54
Download 54 pages 18.92 Kb
Page 7
Image 7
SECTION 1: HEATER SAFETY

SECTION 1: HEATER SAFETY

SECTION 1: HEATER SAFETY

Your Safety is Important to Us! This symbol is used throughout the manual to notify you of possible fire, electrical or burn hazards. Please pay special

attention when reading and following the warnings in these sections.

Installation, service and quarterly

inspection of heater must be done by a contractor qualified in the installation and service of gas-fired heating equipment.

Read this manual carefully before installation, operation or service of this equipment. Heaters are not approved for residential installations. These instructions, the layout drawing, local codes and ordinances and applicable standards that apply to gas piping, electrical wiring, venting, etc. must be thoroughly understood before proceeding with the installation.

Protective gear is to be worn during installation, operation and service. Thin sheet metal parts, including the various venting components, have sharp edges. To prevent injury, the use of work gloves is recommended.

Before installation, check that the local distribution conditions, nature of gas and pressure and adjustment of the appliance are compatible.

1.1 Manpower Requirements

To prevent personal injury and damage to the heater, two persons will be required for installation.

1

Page 7
Image 7
Roberts Gorden UHD[X][S][R] 125, UHD[X][S][R] 75 service manual Heater Safety, Manpower Requirements