Samsung UCC2800C Checking and Testing Operations, Wired Remote Controller, Connecting wiring

Models: ACC2400C ACC2800C UCC2400C UCC2800C

1 70
Download 70 pages 23.81 Kb
Page 64
Image 64
Checking and Testing Operations

Checking and Testing Operations

To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.

Review all the following elements in the installation:

Piping connection tightness to detect any gas leakages

Connecting wiring

Heat-resistant insulation of the piping

Drainage

Earthing wire connection

Correct operations(follow the steps below)

Wired Remote Controller

1 Supply the power and switch on the air conditioner.

2 Press Test button more than 3 seconds without selecting any mode. Result: The air conditioner runs in COOL mode for 3 minutes.

Note If the error code is displayed, fix the error referring to page 66.

And supply the power, restart testing.

3Check that user's option(s) and the outdoor unit operate properly.

Note Do not attempt to select the operating mode or to adjust the temperature. It may switch the outdoor unit off.

4Press the Swing( ◆Connecting wiring ) button and check that the air flow blades work properly.

5The air conditioner will switch it off automatically after 3 minutes.

Note If the air conditioner does not work because of switching off the thermistor sensor caused by the room temperature,

you can operate the air conditioner by using Test button.

E-64

Page 64
Image 64
Samsung UCC2800C Checking and Testing Operations, Wired Remote Controller, Connecting wiring, Earthing wire connection