CHECK AND TEST OPERATION

Check

Be sure to check the following again after completion of installation.

1. Check the piping connection area for any gas leakage.

Outdoor connection area

Indoor connection area

2. Is the drain hose properly connected?

3.Is the insulation of the piping in good condition?

Insulation

4. Is grounding properly made?

30cm( 111613" )

E-34

Page 34
Image 34
Samsung UPC3240C, APC3240C installation manual Check and Test Operation