ENGLISH
➧ Be sure to read the installation manual carefully to ensure sufficient realization of the excellent performance of the unit.
➧ Be sure to drill a hole in the wall necessary for installation before attempting to install the unit.
➧After completion of installation, be sure to perform a test operation of the unit to check for any problem, and then deliver the unit to the customer if the test results are acceptable.
➧After completion of test operation, hand over the owner’s manual, installation manual, and warranty card to the customer.
❈As the installation work requires special skill, be sure to request a qualified dealer to take care of the installation of your unit; the user should not attempt to install his/her unit by himself/herself.
❈Do not attach any electric heating device or
electric heater to the unit.
Do not attempt to disassemble or modify the unit by yourself. (It may cause machine trouble, electric shock or fire.)
Absolute Checkpoints
1. Drain check | 2. Drilling a hole in the wall |
Less than 150mm (5 87" )
60mm(2 3"8 )
▼
Refer to page 31 for detailed procedures.
▼