110
19
BASIC OPERATIONS ON CONTROL PANEL
The following operation are possible through control panel:
1. Setting the temperature䊶䊶䊶The chamber temperature can be set (page 20).
2. Setting the CO2 density䊶䊶䊶The chamber CO2 density can be set (page 20).
3. Setting the key lock䊶䊶䊶Changing the temperature and CO2 density can be disabled (page 21).
4. Setting alarms䊶䊶䊶The temperature alarm, CO2 density alarm (page 25), and upper limit alarm
temperature (page 24) can be set.
5. Setting UV parameters䊶䊶䊶ON/OFF parameters and the ON period of the UV lamp can be set for the
MCO-19AIC(UV) or when the Incubator is equipped with the optional MCO-19UVS (page 26).
6. Setting other parameters䊶䊶䊶The initial settings of the date, time, and log cycle (page 30), and the
LCD display and baud rate (page 32) can be set.
7. Displaying the operation log and transferring data䊶䊶䊶A graph of past operation data can be
displayed (page 33) and operation data can be transferred to a PC (page 34).
8. H2O2 decontamination䊶䊶䊶H2O2 decontamination of the chamber and internal attachments can be
performed when the optional H2O2 Generator (MCO-HP) is installed (page 40).
9. Automatic CO2 cylinder changeover䊶䊶䊶The cylinder can be switched when the optional automatic
CO2 Cylinder Changeover System (MCO-21GC) is installed (page 57).
10. Setting the CO2 standard gas density䊶䊶䊶The CO2 standard gas density can be set when the
optional Automatic CO2 Standard Gas Calibration Kit (MCO-SG) is installed. (page 59)