Schneider Electric ACECFR40200SE, ACECFR20101SE, ACECFR20200SE Remove the tension rods

Models: ACECFR40201SE ACECFR20201SE ACECFR40101SE ACECFR40200SE ACECFR20200SE ACECFR20101SE

1 32
Download 32 pages 61.48 Kb
Page 20
Image 20
Remove the tension rods

Remove the tension rods

SUPPLY

BLOWER

ACCESS

COIL

ACCESS

SUPPLY

BLOWER

ACCESS

COIL

ACCESS

SUPPLY

BLOWER

ACCESS

COIL ACCESS

SUPPLY BLOWER ACCESS

COIL

ACCESS

na3450a

Manual background WARNING

DAMAGE TO EQUIPMENT OR PERSONNEL

Loosen the nuts on the ends of the tension rods to relieve tension before removing tension rod brackets.

Do not remove the tension rods until EcoBreeze Frame is placed and secured on its supports.

Move the EcoBreeze Frame directly from the truck to its permanent foundation or supports. If it must be stored temporarily, it must be placed on a flat and level surface to avoid damage.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

Tension rods are installed diagonally across each Module bay to provide support during shipping.

1.Release tension on the rods by loosening the nuts on the ends of the tension rods.

2.Using an M12 wrench, remove the eight bolts securing the tension rod brackets.

3.Remove the tension rods and brackets.

16

EcoBreeze System Installation

Page 20
Image 20
Schneider Electric ACECFR40200SE, ACECFR20101SE, ACECFR20200SE, ACECFR40101SE, ACECFR20201SE Remove the tension rods