6.Locate the insulation strips packed in the ship-loose kit.

7.Remove the backing from the insulation and apply the insulation around the air transition ducts.

8.Open the damper on the supply air transition.

Water supply connection

NOTE: There are two water supply inlets on the EcoBreeze Frame. Use separate sources if possible to provide a redundant water supply.

NOTICE

DAMAGE TO EQUIPMENT

Install adequate freeze protection (not supplied) on all external water piping.

Freeze protection (which may consist of any combination of insulation and electric heat-tracing) must be correctly applied based on local climatic conditions and best practices.

Failure to follow these instructions can result in equipment damage.

Sand filtration connections are provided if further filtration of the water supply is required. Sand filtration systems can be acquired from a third-party vendor.