Electrical Connections

The electrical connections required are the following:

Power to Frame

Control (remote display interface)

Communication - Building Management System (BMS) - optional

Make all electrical connections in accordance with applicable industry guidelines as well as national and local codes.

Make all low-voltage connections, including data and control connections, with properly insulated wires. The low-voltage wires and connections must have at least 300V insulation.

DANGER

HAZARD OF ELECTRIC SHOCK

Use a voltmeter to ensure that power is turned off before making any electrical connections.

Failure to follow these instructions will result in death or serious injury.

NOTE: Three-phase electrical service is required. Electrical service must conform to national and local electrical codes.

EcoBreeze System Installation

21

Page 25
Image 25
Schneider Electric ACECFR20200SE, ACECFR20101SE, ACECFR40200SE, ACECFR40101SE, ACECFR20201SE Electrical Connections