930-110-01-B.00 PowerLogicTM EM4800 Series
04/2011 Installation
© 201 Schneider Electric All Rights Reserved 17
For a 416Y/240V (or 380Y/220V) three-phase wye panel with the
230/240V variant of the meter:
• Connect meter terminal A to the voltage disconnect phase A (red wire)
• Connect meter terminal B to the voltage disconnect phase B (black
wire)
• Connect meter terminal C to the voltage disconnect phase C (blue wire)
• Connect meter neutral terminal to neutral bar in the voltage disconnect
panel (white wire)
• Connect earth wire to earth post using lug provided
• Install power supply shorting jumpers (see Figure 8)
Figure 8: PowerLogic EM4800 meter 416Y/240V three-phase wye
service connection
Legend:
1 BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9 0.75-inch (1.9-cm) strain relief
8
4
7
5
6
2
1
3
9