930-110-01-B.00 PowerLogicTM EM4800 Series
04/2011 Installation
© 201 Schneider Electric All Rights Reserved 17
For a 416Y/240V (or 380Y/220V) three-phase wye panel with the
230/240V variant of the meter:
Connect meter terminal A to the voltage disconnect phase A (red wire)
Connect meter terminal B to the voltage disconnect phase B (black
wire)
Connect meter terminal C to the voltage disconnect phase C (blue wire)
Connect meter neutral terminal to neutral bar in the voltage disconnect
panel (white wire)
Connect earth wire to earth post using lug provided
Install power supply shorting jumpers (see Figure 8)
Figure 8: PowerLogic EM4800 meter 416Y/240V three-phase wye
service connection
Legend:
1 BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9 0.75-inch (1.9-cm) strain relief
8
4
7
5
6
2
1
3
9