930-110-01-B.00

PowerLogicTM EM4800 Series

04/2011

Installation

 

 

1.

Connect the 50-pin connector to the PowerLogic connector located at

 

the bottom side of the unit, and secure it in place with the retaining clips.

2.

Feed the free end of the cable through the bottom left of the meter

 

enclosure.

 

This cable is made up of twisted-pair wires for connecting the individual

 

CTs to the metered points. The color codes for the X1 (positive) and X2

 

(neutral) connections for each CT are listed in Table 2 on page 26.

 

NOTE: The direction of the energy flow is indicated on the CT.

3.

Turn off the power feed to the panel where the CTs are being installed.

 

Always use a properly rated voltage sensing device to confirm power is

 

off.

4.

Feed the CT cable into the panel through an appropriate punch-out with

 

an approved strain relief.

5.

Strip the plastic sheaths on the cable to an appropriate length to expose

 

the wire pairs. Cut and strip the CT leads and wire pair leads to an

 

appropriate length. Crimp the CT leads to the wire pairs for each meter

 

point.

6.

Connect the X1 lead of the CT to the X1 lead of the cable, then connect

 

the X2 lead of the CT to the X2 lead of the cable (see Table 2).

7.

When using solid-core CTs, remove the feed wire from the circuit

 

breaker, place the CT over the wire, and reconnect to the circuit

 

breaker. Ensure that the arrow on the CT label is pointing in the

 

direction of the energy flow (toward the load).

8.

When using split-core CTs, separate the halves of the CT and place the

 

CT over the wire to the circuit breaker. Ensure that the CT is facing the

 

source as shown on the label. Install cable ties to ensure that the CT

 

halves are held together securely.

9.

Repeat steps 5 to 8 for the remaining CTs.

Installing 5A Converters and CTs on the PowerLogic EM4880

When both low-current (200A and 400A) and high-current (600A or higher) circuits need to be measured with the same PowerLogic meter, converters are available to allow the use of Measurement Canada approved 5A CTs with the appropriate current rating. 5A CT converters transform the 5A maximum output from a standard CT to the 80mA maximum of the PowerLogic meter.

The 5A side of the converter is the black and red wire pair, and the 80mA side of the converter is the black and white wire pair.

NOTE: It is recommended that 5A converters and shorting devices be installed in a sealable metal enclosure.

© 201 Schneider Electric All Rights Reserved

23

Page 29
Image 29
Schneider Electric E4800 manual Installing 5A Converters and CTs on the PowerLogic EM4880

E4800 specifications

Schneider Electric's E4800 is a robust solution designed for comprehensive energy management, combining advanced features, innovative technologies, and user-friendly characteristics that cater to the needs of various industries. This device primarily focuses on enhancing efficiency in energy consumption and optimizing operational performance.

One of the standout features of the E4800 is its ability to monitor and manage energy consumption in real-time. This capability allows businesses to identify energy usage patterns, track costs, and gain insights into where energy can be saved. The real-time data analysis supports decision-making, enabling organizations to implement energy-saving strategies effectively.

The E4800 is equipped with an intuitive user interface that simplifies navigation and data interpretation. Users can access detailed analytics and reporting tools that provide visibility into energy performance metrics. This user-friendly aspect ensures that both technical and non-technical staff can utilize the system, fostering a culture of energy efficiency across the organization.

Additionally, Schneider Electric has integrated advanced communication technologies into the E4800. It supports various communication protocols such as Modbus, BACnet, and Ethernet, enabling seamless integration with existing systems and infrastructure. This versatility ensures that organizations can leverage their current investments in technology while upgrading to more advanced energy management solutions.

The E4800 is also designed with scalability in mind. Organizations can easily expand their energy management capabilities as their needs grow. Whether managing a single facility or a multi-site operation, the E4800 can adapt to varying requirements without significant overhauls or disruptions.

Another noteworthy characteristic is its compliance with global standards for energy management and sustainability. By utilizing the E4800, companies can demonstrate their commitment to environmental responsibility and adherence to regulations, which is increasingly important in today’s business landscape.

Lastly, Schneider Electric's E4800 comes with robust support services, ensuring that users can access assistance whenever needed. This commitment to customer service solidifies its position as a reliable solution for energy management.

In summary, Schneider Electric's E4800 offers a comprehensive suite of features designed for effective energy management, leveraging real-time analytics, versatile communication technologies, scalability, compliance with global standards, and excellent customer support, making it an ideal choice for businesses aiming to enhance their energy efficiency and sustainability.