930-110-01-B.00 PowerLogicTM EM4800 Series
04/2011 Regulatory Compliance
© 201 Schneider Electric All Rights Reserved 35
REGULATORY COMPLIANCE The PowerLogic EM4800 meter must be installed by a qualified electrician
with knowledge of local installation regulations. Initial installation of the unit,
and any subsequent modification to the unit, must be inspected by the local
electrical inspection authority.
The PowerLogic EM4800 meter complies with the standards listed in
Table 4.
Table 4: Regulatory Compliance
Equipment servicing and access The information in this section must be considered as a mandatory
requirement, and must be strictly adhered to when installing and operating
PowerLogic EM4833, EM4880 and EM4805 meters.
Access to equipment
The equipment must be accessible to authorized personnel only. Equipment
must be installed in areas where access can be restricted.
Servicing the equipment
No preventive maintenance is required on any of the equipment. Visually
inspect the equipment yearly and ensure it is free of dust or other particles.
If necessary, wipe with a clean cloth.
Component servicing
Individual components are not user-serviceable, and must be returned to
Schneider Electric for repair. If an equipment fault occurs, do not attempt to
repair the faulty component.
All maintenance activities should be performed by qualified personnel only.
Do not perform any operating or maintenance procedures that are not
described in the product documentation provided by Schneider Electric.
Discipline Regulatory and industry standard
Standards UL certified to IEC/EA/UL/CSA 61010-1 2nd Edition
CSA-C22.2 No. 61010-1-04
Emissions (EMC) FCC Part 15 Class B, ICES-003 EN55022, IEC 6100-4-5
Surge power/telephone lines ANSI/TIA968-A: 2002