PowerLogic ION7550 / ION7650 Installation Guide
Before You Begin
Before installing the meter, familiarize yourself with the steps in this guide and read the safety precautions presented on the “Installation Considerations” page.
DANGER
Do not power up the meter until the current and voltage wiring is completed.
Recommended Tools
Phillips screwdriver
Precision
Wire cutters / stripper
Meter Overview
Meter Front | Meter Back |
Voltage and Current Inputs
Softkeys |
ESC Button |
Optical Port |
|
|
|
|
|
|
|
Operational |
| Navigation |
| PROG/SELECT | ||
LEDs |
| Buttons |
| Button |
Digital Inputs | Analog Inputs Analog Outputs |
I/O Expansion
Card
Power |
| Communications | Ground | |||
Supply | ||||||
Card |
| Terminal | ||||
|
|
| ||||
| Form C |
| Digital | Form A | ||
| Digital Outputs | Inputs | Digital Outputs |
PROG
ESC
Front Panel Button Functions
PROG/SELECT: Press the PROG/SELECT (program or select) button to enter Setup mode. In Setup mode, press the PROG/SELECT button to accept changes.
ESC: Press the ESC (Escape) button to return to a higher menu or discontinue a configuration change.
NAVIGATION: Press the UP / DOWN arrow buttons to highlight menu items, or increment / decrement numbers.
Press the LEFT or RIGHT arrow buttons to move to an adjacent digit.
SOFTKEY: Press a SOFTKEY button to select the parameter that you want to configure from the
6 | © 2007 Schneider Electric. All rights reserved. |