LC-52LE920UN/LC-60LE920UN

iv)Peel the protective sheet of the OCA.

Lift the ITO section, then peel the protective sheet by about half by means of the pull tap.

*Peeling it completely reduces workability. Check the order due to workability.

v)Contact the FPCB and joint end of the transparent electrode film with the glass.

*Grasp the opposite end. Note that the ITO is positioned by adhering.

*Note: Do not bend the PWB (FPCB section) and sheet (ITO section).

vi) Adhere the transparent electrode completely.

lPull tap for peeling the front protective sheet I

Peel the front protective sheet.

If bubbles are found, press those portions with glass cleaning cloth, etc. to remove them as much as possible.

Use a rubber roller since pressure exerted by it removes bubbles easily. See photo below.

For the TOUCH SENSOR Unit positioning figure, see page 5-1, 5-2, 5-3, 5-4.

4-15

Page 26
Image 26
Sharp service manual LC-52LE920UN/LC-60LE920UN