Description This section should be used for installation sites that must conform to CE
(Conformite Europeene) Certification. Typically, this does not apply to
installations outside the EC unless the equipment was purchased with
the explicit requirements and expectations that it shall conform to EC
Electromagnetic and Radio Frequency Interference (EMI/RFI) rejection
specifications.
CE Installation Kit Available from Siemens is the CE Installation Kit P/N 2020264-001. This
kit has all the parts for all the installations referenced in this section.
Instructions The following information pertains to CE Installation of General Purpose,
Zone 1 and Division 2 Equipment. For Zone 1 Installations, all cabling is
terminated in the ANG Zone 1 Enclosure.
The preferred method is to route the field wiring in metallic conduit. If
metallic conduit is used, unshielded power and the signal wires can be
used. The power and signal wires (DataNET or Ethernet) must be routed
in separate conduit.
Installation with Metallic
Conduit
Using flexible conduit and/or armored cable is equivalent to using “steel
conduit”. Flexible conduit or armored cable must have its flexible conduit
and/or armoring conductivity 360-degree terminated at its entry to the
enclosure (or bulkhead).
If conduit is not used, the following installation practices must be used to
ensure that the CE certification remains valid:
Installation without
Metallic Conduit
1. A shielded power cord or cable must be used for the input power
wiring. The shield must be terminated at the unit in a 360-degree
termination at the enclosure (bulkhead); use P/N 2015729-001
contained in the CE Installation Kit or an equivalent part. For Zone 1
Installation use P/N 1311001-014 Installation Kit.
2. The DataNET copper cables shields must be terminated in a 360-
degree termination at the enclosure (or bulkhead; use P/N 2015729-
001 contained in the CE Installation Kit or an equivalent part). For
Zone 1 Installation, use P/N 13111001-014 Installation Kit.
2000592-001 Installation • 11