Siemens NCM S7 appendix Creating an Industrial Ethernet Subnet, Aims

Models: NCM S7

1 255
Download 255 pages 41.39 Kb
Page 48
Image 48

Installing and Starting the Ethernet CP with STEP 7

2.2.1Creating an Industrial Ethernet Subnet

Aims

To be able to attach the SIMATIC stations to a subnet, you create the subnet in your project. This means that all the parameters for the entire subnet are managed centrally.

Procedure

It is advisable to create the subnet before you configure the stations since the assignment of the SIMATIC stations is then performed largely automatically.

It is also possible to create the subnet at a later point in time when configuring a CP. This is explained in more detail later in the chapter.

Follow the steps outlined below:

1.Select the project in the SIMATIC Manager.

2.Select Insert " Subnet " Industrial Ethernet.

Result: An object of the type network is created in the project. This allows all the SIMATIC stations created in the project to be attached to this subnet.

Figure 2-1 Project with Assigned Ethernet Network

48

SIMATIC NET NCM S7 for Industrial Ethernet

Release 6/2003

C79000–G8976–C129–07

Page 48
Image 48
Siemens NCM S7 appendix Creating an Industrial Ethernet Subnet, Aims, Select Insert Subnet Industrial Ethernet