Sim2 Multimedia HT300 Link Switching On And Off, b, Switching On From Stand-By

Models: HT300 Link

1 39
Download 39 pages 27.48 Kb
Page 15
Image 15
5 SWITCHING ON AND OFF

5 SWITCHING ON AND OFF

The HT300 LINK system consists of the Projector and the DigiOptic™ Image Processor (which is also the system control centre). The DigiOptic™ Image Processor sends commands to the Projector and receives operating status information from the Projector and function commands from the user. The system can be controlled from either the remote control (via the infrared sensors on the DigiOptic™ Image Processor and on the Projector) or the keypad located on the rear of the Projector.

The two units have separate power supplies however: after connecting the unit to the electrical mains supply:

1)Set the two power switches to “I”; the DigiOptic™ Image Processor power switch is located on the external power supply unit (Fig. 13c), while the Projector switch is on the rear panel (Fig. 13a).

2)Turn on the DigiOptic™ Image Processor by pressing the button on the front panel (Fig. 13b).

Fig.13a

Fig.13a

I

 

 

 

 

 

O

 

 

 

 

 

 

I

 

 

 

 

 

O

 

 

 

 

 

 

D

 

 

 

 

 

IGIOPTI

 

 

 

 

 

C ™

IMAGE

 

 

 

 

 

PRO

 

Fig.13c

 

 

 

CESSOR

 

 

 

 

 

 

 

 

ON

Fig.13c

 

 

 

 

OFF

 

 

 

 

 

 

IMA

 

 

 

 

 

GE

PROCE

 

 

 

 

 

 

 

 

 

 

SS

 

 

 

 

 

OR

 

 

 

 

 

ON

 

 

 

 

 

O

 

 

 

 

 

FF

 

 

 

Fig.13b

Fig.13b

After a few seconds (system initialisation interval), the DigiOptic™ Image Processor and the Projector assume stand- by mode.

System status information is provided by two LEDs (green and blue) on the front panel of the DigiOptic™ Image Processor, a blue and green LEDS on the rear of the Projector.

Significant status signals are given in Table 3.

Table

3

 

 

DigiOptic Image

Projector

Status

Processor

 

 

Green LED Blue LED Green LED Blue LED

Off

 

 

Initialisation

Stand-by

On

Cooling

Optical link not active

Caution

 

 

-

-

Error

 

 

-

-

: Off

: On

: Flashing

- : Insignificant

If the “No optical link” or “Error” signals are active the system cannot be operated; if the “Warning” signal is active the system will operate but it may be unable to read certain input signals correctly.

SWITCHING ON FROM STAND-BY

Switching on the system (Fig.14):

from the remote control (keys 0-9)

from the Projector keypad (keys ￿ and ￿).

0

LIG

RC

I

 

HT

2005

Fig.14

13

Page 15
Image 15
Sim2 Multimedia HT300 Link installation manual Switching On And Off, b, Switching On From Stand-By